EVERYTHING ABOUT PILING LOAD TEST

Everything about Piling Load Test

The test pile is generally put in involving two anchor piles in this type of manner where the muse piles are to get installed. The test pit need to be not less than 3B or 2.5 m distinct within the anchor piles.Analysis: Engineers analyze the load-settlement data to ascertain the final word bearing capability from the soil or the load-carrying capab